CASE STUDY

There was a flooded street gully next to an underpass. Our intention was to install an overflow pipe but due to the frozen ground we couldn’t excavate. We needed to thaw the ground around the pedestrian passage and ditch area. It was easy to take the compact Wacker Neuson E700 M surface heater on the site.

SETTING UP THE SURFACE HEATER IS QUICK. THE MACHINE IS QUIET AND WORKS EFFECTIVELY WITH ITS OWN COMPRESSOR.

THERE IS AN UP TO 80C LIQUID MIXTURE FLOWING IN THE HOSE WHICH EFFECTIVELY THAWS EVEN DEEPLY FROZEN GROUND.

WE CAN ALSO THAW FROZEN GROUND IN CHALLENGING WEATHER CONDITIONS.

THE HOT HOSE IS SPREAD ON THE SURFACE TO BE THAWED.

THE GROUND UNDER THE HOSE BEGINS TO THAW FAST.

IT´S POSSIBLE TO THAW EVEN SLOPING SURFACES.

WE CAN EFFICIENTLY THAW THE GROUND AROUND A FLOODED GULLY.

THERE IS ENOUGH HOSE FOR THAWING LARGE AREAS.

THE MOST EFFECTIVE THAWING IS ACHIEVED BY COVERING THE HOT HOSES WITH INSULATING MATS.

IF NEEDED, A TRAFFIC ROUTE CAN BE BUILD ON THE SPOT.

THE GOUND THAWS QUICKLY AND THE TRAFFIC FLOWS.

SAFETY AND FIRST CLASS FINISH WITH THOROUGH ATTENTION TO THE DETAIL ARE SIGNIFICANT VALUES TO US.

THE MACHINE THAWS THE GROUND IN APPROXIMATELY 48 HOURS. AFTER THAT THE COVERING HOSES CAN BE TAKEN AWAY AND EXCAVATING THE GROUND IS EASY.

CONTACT US

FOR MORE INFORMATION!

CASE STUDY

There was a flooded street gully next to an underpass. Our intention was to install an overflow pipe but due to the frozen ground we couldn’t excavate. We needed to thaw the ground around the pedestrian passage and ditch area. It was easy to take the compact Wacker Neuson E700 M surface heater on the site.

SETTING UP THE SURFACE HEATER IS QUICK. THE MACHINE IS QUIET AND WORKS EFFECTIVELY WITH ITS OWN COMPRESSOR.

THERE IS AN UP TO 80C LIQUID MIXTURE FLOWING IN THE HOSE WHICH EFFECTIVELY THAWS EVEN DEEPLY FROZEN GROUND.

WE CAN ALSO THAW FROZEN GROUND IN CHALLENGING WEATHER CONDITIONS.

THE HOT HOSE IS SPREAD ON THE SURFACE TO BE THAWED.

THE GROUND UNDER THE HOSE BEGINS TO THAW FAST.

IT´S POSSIBLE TO THAW EVEN SLOPING SURFACES.

WE CAN EFFICIENTLY THAW THE GROUND AROUND A FLOODED GULLY.

THERE IS ENOUGH HOSE FOR THAWING LARGE AREAS.

THE MOST EFFECTIVE THAWING IS ACHIEVED BY COVERING THE HOT HOSES WITH INSULATING MATS.

IF NEEDED, A TRAFFIC ROUTE CAN BE BUILD ON THE SPOT.

THE GOUND THAWS QUICKLY AND THE TRAFFIC FLOWS.

SAFETY AND FIRST CLASS FINISH WITH THOROUGH ATTENTION TO THE DETAIL ARE SIGNIFICANT VALUES TO US.

THE MACHINE THAWS THE GROUND IN APPROXIMATELY 48 HOURS. AFTER THAT THE COVERING HOSES CAN BE TAKEN AWAY AND EXCAVATING THE GROUND IS EASY.

CONTACT US

FOR MORE INFORMATION!

© JM PIPE WELDING OY. ALL RIGHTS RESERVED.
SITE BY:OuWau Design & Productions
CONTACT US
© JM PIPE WELDING OY. ALL RIGHTS RESERVED.
SITE BY:OuWau Design & Productions